The formula

250,000 sq ft1,000,000 sq ft50,000 sq ft
Floor area
80 to 150 W80 to 150 W80 to 150 W
Power per square foot
Capacity20 to 38 MW80 to 150 MW4 to 7.5 MW

What capacity means

Capacity is facility capacity: the most power the campus can draw from the grid at full build, cooling and other loads included. It is not the IT load alone.

Stated figures come first

When a record states capacity, we use it. If several records state different figures, we take the largest from the most direct kind of record, in this order: the operator, a utility filing, a permit, a requested load, a tax incentive filing, an announcement, any other statement. We never add figures from different records together.

A figure from a third-party tracker list is shown as reported. It never replaces a figure from a filing.

The calibrated estimate

For a planned campus with no stated figure, we first compare it with campuses that do have one. We take a size signal the record does state (backup generator capacity, floor area, stated investment or site acreage) and scale it by the ratio seen across campuses where both are known. The low, middle and high ends come from the lower quarter, middle and upper quarter of those ratios.

We only use this when at least 10 comparable campuses exist, their ratios do not spread more than 6 times from lower to upper quarter, and the campus falls inside the range they cover. The ratios move a little each release as more figures are filed.

Fixed ranges

When the calibrated estimate does not apply, the first signal that fits wins:

Signal Range
Backup generators 0.35 to 0.70 times generator MW
Floor area, 10,000 sq ft or more 80 to 150 W per sq ft (60 to 130 W for operating sites of 2,000 to 10,000 sq ft)
Operating building footprint (mapped or at an exact pin) 90 to 220 W per sq ft (mapped), or 80 to 160 W per sq ft (60 to 130 W for 200 to 500 m²)
Roof area measured from aerials 80 to 160 W per sq ft, after dividing the roof by 1.6 (capped at 2.5 million sq ft)
Site acreage 1.3 to 3.6 MW per acre
Stated investment, $50 million or more 60 to 250 MW per $1 billion

Roof outlines traced from imagery run larger than floor area, which is why measured roof is divided by 1.6 first.

Rounding

Estimates are rounded to two significant figures above 100 MW, to whole MW from 10 to 100 MW and to one decimal below 10 MW. An estimate is marked est on lists and starts with ≈ on records.

When we show nothing

  • No stated capacity, and no floor area, site size, backup generators or investment figure to estimate from
  • The site is flagged as not a data center