# Capacity estimates

Where a campus's capacity in MW comes from, and how we estimate it when no one has stated it.

Source: https://docs.wattlas.io/methods/capacity-estimates/

## The formula

Floor area × Power per square foot = Capacity

| Example | Floor area | Power per square foot | Capacity |
| --- | --- | --- | --- |
| 250,000 sq ft building | 250,000 sq ft | 80 to 150 W | 20 to 38 MW |
| 1,000,000 sq ft campus | 1,000,000 sq ft | 80 to 150 W | 80 to 150 MW |
| 50,000 sq ft building | 50,000 sq ft | 80 to 150 W | 4 to 7.5 MW |

## What capacity means

Capacity is facility capacity: the most power the campus can draw from the grid at full build, cooling and other loads included. It is not the IT load alone.

## Stated figures come first

When a record states capacity, we use it. If several records state different figures, we take the largest from the most direct kind of record, in this order: the operator, a utility filing, a permit, a requested load, a tax incentive filing, an announcement, any other statement. We never add figures from different records together.

A figure from a third-party tracker list is shown as reported. It never replaces a figure from a filing.

## The calibrated estimate

For a planned campus with no stated figure, we first compare it with campuses that do have one. We take a size signal the record does state (backup generator capacity, floor area, stated investment or site acreage) and scale it by the ratio seen across campuses where both are known. The low, middle and high ends come from the lower quarter, middle and upper quarter of those ratios.

We only use this when at least 10 comparable campuses exist, their ratios do not spread more than 6 times from lower to upper quarter, and the campus falls inside the range they cover. The ratios move a little each release as more figures are filed.

## Fixed ranges

When the calibrated estimate does not apply, the first signal that fits wins:

| Signal | Range |
| --- | --- |
| Backup generators | 0.35 to 0.70 times generator MW |
| Floor area, 10,000 sq ft or more | 80 to 150 W per sq ft (60 to 130 W for operating sites of 2,000 to 10,000 sq ft) |
| Operating building footprint (mapped or at an exact pin) | 90 to 220 W per sq ft (mapped), or 80 to 160 W per sq ft (60 to 130 W for 200 to 500 m²) |
| Roof area measured from aerials | 80 to 160 W per sq ft, after dividing the roof by 1.6 (capped at 2.5 million sq ft) |
| Site acreage | 1.3 to 3.6 MW per acre |
| Stated investment, $50 million or more | 60 to 250 MW per $1 billion |

Roof outlines traced from imagery run larger than floor area, which is why measured roof is divided by 1.6 first.

## Rounding

Estimates are rounded to two significant figures above 100 MW, to whole MW from 10 to 100 MW and to one decimal below 10 MW. An estimate is marked est on lists and starts with ≈ on records.

## When we show nothing

- No stated capacity, and no floor area, site size, backup generators or investment figure to estimate from
- The site is flagged as not a data center

## What to watch for

An estimate from floor area or acreage tells you the size class, not the figure. Treat a range as an order of magnitude until a filing states the number.