Ahead of the record
Earthwork or buildings seen from above while the record still says Announced or a zoning stage. See Build phase from aerials.
Balancing authority
The body that keeps supply and demand matched on one part of the grid. Wattlas shows the main one for the campus’s state.
Build phase
What aerial imagery shows at the site: Undeveloped, Active grading or pad, Shell under construction, Completed campus, Substation only, Non-DC parcel or Unclear.
Built-up
The share of the ground around a site that is not vegetation in satellite imagery. See Ground change from satellite.
Capacity
Facility capacity in MW: the most power a campus can draw from the grid at full build, cooling included. See Capacity estimates.
County queue
New generation waiting to connect to the grid in the campus’s county, split into Firm or with storage and Wind and solar alone. Supply, not demand, and not signed agreements. See Grid around the site.
Data as of
The date of the data release on screen.
Dispatchable (Firm or with storage)
Generation that can run on demand or includes storage: gas, nuclear, storage, hydro, coal, geothermal and hybrid plants. Shown on records as Firm or with storage.
Estimated
A value we worked out from other facts, always a range, marked est or ≈. See Stated, reported, estimated.
Flood zone
Minimal, Undetermined, 100-year floodplain or Not mapped. See Water stress and hazard.
Free cooling hours
Hours per year with outside air below 15 °C at the site. See Free cooling hours.
GWh, TWh
Gigawatt hours and terawatt hours of electricity. 1 TWh is 1,000 GWh; 1 GWh is 1,000 MWh.
Industrial rate
The price per kWh a utility charges industrial customers, from its filed tariff or the state average.
Latest record
The date of the newest dated record on a campus.
Lead
A campus backed only by third-party lists, news mentions or notices. Leads sit in Unconfirmed. See Verified, single source, lead.
Likely site
A pin at the address given in a filing or listing. See Location accuracy.
Mgal
Million US gallons. Water use is shown in Mgal/year.
Monday email
The watchlist email for Pro accounts with alerts on, sent every Monday at 13:00 UTC with changes on watched campuses since the last one.
Moratorium
A local pause on new data center approvals. Status is Active, Pending, Extended, Expired or Replaced. See Opposition matches.
MW
Megawatts of electrical capacity.
Operating
A campus that is running. Also the group of such campuses. See Pipeline, Operating, Unconfirmed.
Pipeline
Planned and under construction campuses with an official stage record. Also the main list in the app.
Primary record
A filing, permit, utility case, tax incentive agreement or the operator’s own statement.
PUE
Power usage effectiveness: facility energy divided by IT energy. 1.0 would mean every kWh goes to servers. See Water use.
Reported
A value from a third-party list with no primary record behind it yet. Left out of totals.
Single source
A campus backed by one kind of source.
Solid
Passes the evidence test for the default Pipeline view.
Stage
How far a campus has moved, from Listed to Operating. See Stages.
Stage date
The date of the record that set the current stage.
Stated
A value given by a primary record.
Substation
Where high voltage lines step down to feed local load. Wattlas infers the nearest one from where named lines of 115 kV or more end.
Tariff
A utility’s filed schedule of rates.
Tier
Verified, single source or lead.
Unconfirmed
The group of campuses known only from third-party lists, not operating.
Verified
Backed by at least two independent kinds of source, including a primary record. Marked with a shield.
Water per kWh
Litres of water used per kWh of IT energy, set by the cooling type and climate.
Water stress
The share of available water in the site’s basin already withdrawn each year, from Low to Extremely High. See Water stress and hazard.