# What to pay attention to

The handful of things that most often lead to a wrong reading of a Wattlas record.

Source: https://docs.wattlas.io/methods/what-to-pay-attention-to/

## Stated capacity is a ceiling

Announced and permitted MW usually describe the whole campus at full build. Power draw for the first years is far lower.

## Estimates are size classes

An estimate from floor area or acreage can span a factor of two or more. Use it to sort and compare, not to quote.

## County-only locations

When a campus is only placed at the county center, the map draws it dim, and the record leaves out distances and anything measured at the pin. Water stress for such a campus describes the county center, not the site. See [Location accuracy](/methods/location-accuracy/).

## Totals cover the default Pipeline

Home and Pipeline totals count the default Pipeline only. Operating and Unconfirmed campuses are separate, and so are figures that only third-party lists give.

## Dates mean different things

| Date | What it is |
| --- | --- |
| Stage date | The date of the record that set the current stage |
| Latest record | The newest dated record on the campus |
| Change date | The record's own date, not the day we found it |
| Data as of | The date of the data release |

A filing we find late shows under its own date, so it can land below older entries in Changes.

## Opposition is matched by name

Petitions and posts are linked to a campus by place and project names in their text. Read the item before counting it. See [Opposition matches](/methods/opposition-matches/).

## Jobs are near, not at

Job postings are matched to the city around a campus. They are leads, not proof the job belongs to that campus.

## Some settings live in your browser

Column choices, the map base layer and Ask history stay in the browser you set them in.

## What to watch for

When a number matters for a decision, check the Records section on the campus page and read the filing behind it.
