# Stages

The steps a campus moves through from listing to operating, and which records can move it.

Source: https://docs.wattlas.io/methods/stages/

## The steps

| Stage | What it means |
| --- | --- |
| Listed | Named in a list, with no public step yet |
| Announced | The owner or a public body has announced it |
| Zoning filed | A rezoning or land use application is filed |
| Zoning approved | The rezoning or land use is approved |
| Site permit | A site, grading or environmental permit is issued |
| Building permit | A building permit is issued |
| Construction | Construction has started |
| Operating | The campus is running |
| Withdrawn | Cancelled, denied or withdrawn |

## How we set the stage

A campus takes the highest step that any of its records proves. Records about the area or the market around it do not count.

Third-party lists never prove a stage. A campus that only appears in such lists stays in Unconfirmed. Some notices that mention construction only count as Announced unless a site permit or a later record backs them.

## Stage date

The stage date is the date of the record that set the current stage. Near the top of a record, the Why block shows the stage name with a quote, the date and a link to that record.

## On the record

The stage ruler on a record shows Announced, Zoning, Site permit, Building permit, Construction and Operating, with since and the stage date. Withdrawn sits off the ruler.

## What to watch for

Stage only moves when we find a record for the next step. A campus that is clearly under construction on the ground can stay at an earlier stage until the permit or filing appears; the aerial phase shows that gap.
