# Prompts that work

Questions and multi-step agent workflows that map cleanly onto Wattlas MCP tools.

Source: https://docs.wattlas.io/agents/prompts-that-work/

## Try right away (no sign-in needed)

- Summarize the Virginia data center pipeline in Wattlas and separate disclosed MW from estimated MW
- Check active or pending data center moratoriums in Georgia and Indiana with Wattlas
- Compare the Northern Virginia, Dallas and Phoenix data center markets using Wattlas
- Find open data center commissioning and electrical engineering jobs in Ohio with Wattlas
- Open the full Wattlas sample dossier for `c_5cda962849` and summarize its grid, water and filings

## By team (Pro)

### Suppliers, MEP and EPCs

- Search Wattlas for Texas campuses in `site_permit` or `building_permit` over 100 MW and list their owners, utilities and campus ids
- Rank Wattlas campuses in Virginia by `backup_diesel_mw` and pull the `diesel_epa` dossier section for the top three
- Find campuses in Ohio with `earthwork_ahead_of_stage` using Wattlas `get_site_rankings`

### Site selection and permitting

- Search Wattlas for Arizona campuses over 50 MW with `High` or `Extremely High` water risk and check local opposition
- Check all moratoriums and lawsuits in Loudoun and Prince William counties, Virginia using Wattlas
- For campus `c_1c0224764f`, pull `grid`, `water_energy`, `parcel_site` and `opposition` from Wattlas

### Investors, utilities and analysts

- Which owners have the most pipeline MW in Ohio according to Wattlas? Separate disclosed MW from estimates
- List cleared government filings in Texas between `2026-09-01` and `2026-11-27` with direct official URLs
- Rank US pipeline campuses by `grid_rate_yoy` and inspect the top metro markets

## Multi-step workflows for agents

When building an automated agent or writing a reusable prompt, chain narrow tool calls instead of pulling huge dumps:

| Workflow | Tool chain |
| --- | --- |
| Market screening | `get_pipeline_summary` -> `get_metro_market` -> `check_moratoriums` |
| Campus due diligence | `search_campuses` -> `get_campus_dossier` (only the sections needed) -> `list_filings` |
| Owner portfolio check | `search_owners` -> `search_campuses(owner=...)` -> `get_campus_opposition` |
| Early construction signals | `get_site_rankings(metric="earthwork_ahead_of_stage")` -> `get_campus_dossier(sections=["core", "satellite", "filings"])` |

## Four habits that improve accuracy

1. **Name the state, county or city and the stage.** Tools filter directly by `state`, `county`, `city`, `stage` and `group`. "Big data centers in the south" forces the model to guess.
2. **State the cohort.** `pipeline` is confirmed planned and under-construction sites. Say `operating`, `unconfirmed` or `all` when you mean those.
3. **Give explicit dates for filings.** `list_filings` defaults to the last 365 days and accepts spans up to 366 days. Give `YYYY-MM-DD` bounds for a tight window.
4. **Pick only the dossier sections you need.** A full `sections: ["all"]` dossier is long. Request `["core", "grid", "filings"]` or `["core", "water_energy", "opposition"]` to stay fast and focused.

## What the tools cannot do

- Forecast when a campus will break ground or come online
- Reveal private contracts, off-market land deals or confidential utility agreements not in public records
- Read external PDFs or web pages outside Wattlas

Ask for outside research separately, and keep Wattlas facts and outside sources clearly separated in the answer.

## What to watch for

Ask the client to quote campus ids and official links from the results. It makes every figure easy to verify and stops the model from filling gaps with guesses.
